1 00:00:05,269 --> 00:00:03,990 we start out our eva at the quest 2 00:00:07,749 --> 00:00:05,279 airlock 3 00:00:10,070 --> 00:00:07,759 jeff will be eb1 he'll be coming out 4 00:00:13,350 --> 00:00:10,080 wearing the red stripes 5 00:00:15,509 --> 00:00:13,360 and kate will hand out an oru bag to him 6 00:00:17,349 --> 00:00:15,519 that contains all the ida tools she'll 7 00:00:19,910 --> 00:00:17,359 egress and then they'll begin their 8 00:00:22,550 --> 00:00:19,920 translation forward out to the very 9 00:00:24,790 --> 00:00:22,560 forward end of the space station to do 10 00:00:26,790 --> 00:00:24,800 their work jeff will translate around 11 00:00:29,269 --> 00:00:26,800 the starboard side of the external 12 00:00:31,029 --> 00:00:29,279 stowage platform number two 13 00:00:33,590 --> 00:00:31,039 he'll wait there just a moment while 14 00:00:36,150 --> 00:00:33,600 kate finishes her initial translation 15 00:00:38,790 --> 00:00:36,160 adaptation and then translates over the 16 00:00:40,389 --> 00:00:38,800 top of the stowage platform out to pick 17 00:00:42,830 --> 00:00:40,399 up her foot restraint which is on the 18 00:00:45,670 --> 00:00:42,840 very forward edge of the 19 00:00:48,709 --> 00:00:45,680 esp2 once she's got that jeff will 20 00:00:51,830 --> 00:00:48,719 translate forward on the lab and that up 21 00:00:54,389 --> 00:00:51,840 over the top of the node 2 and finally 22 00:00:55,750 --> 00:00:54,399 on to the pma2 that's at the very 23 00:00:58,709 --> 00:00:55,760 forward end 24 00:01:01,750 --> 00:00:58,719 of the space station he'll position the 25 00:01:04,950 --> 00:01:01,760 oru bag on a couple of handrails that 26 00:01:06,469 --> 00:01:04,960 are right on the zenith side of the pma 27 00:01:08,710 --> 00:01:06,479 and then open the bag so that they've 28 00:01:10,950 --> 00:01:08,720 got access to their tools and the 29 00:01:12,789 --> 00:01:10,960 equipment 30 00:01:14,630 --> 00:01:12,799 in the meantime kate begins her 31 00:01:16,550 --> 00:01:14,640 translation she's going to translate up 32 00:01:19,350 --> 00:01:16,560 over the top of the lab 33 00:01:22,870 --> 00:01:19,360 and then forward onto the node 2 34 00:01:25,109 --> 00:01:22,880 and finally forward onto the pma2 35 00:01:26,469 --> 00:01:25,119 where she translates down toward the 36 00:01:29,109 --> 00:01:26,479 nader side 37 00:01:32,149 --> 00:01:29,119 and locates the socket where her foot 38 00:01:33,990 --> 00:01:32,159 restraint will go or work site interface 39 00:01:35,990 --> 00:01:34,000 once she has her foot restraint set up 40 00:01:37,109 --> 00:01:36,000 there she'll be able to access the 41 00:01:39,350 --> 00:01:37,119 cables 42 00:01:41,990 --> 00:01:39,360 that were pre-positioned by butch 43 00:01:43,990 --> 00:01:42,000 wilmore on a prior eva they're tied off 44 00:01:45,429 --> 00:01:44,000 to a in a bundle to a couple of 45 00:01:48,389 --> 00:01:45,439 handrails 46 00:01:50,630 --> 00:01:48,399 that are located on the pma 47 00:01:52,789 --> 00:01:50,640 while she's getting set up jeff will 48 00:01:55,350 --> 00:01:52,799 also get his foot restraint and get it 49 00:01:57,990 --> 00:01:55,360 set up it's currently located on the top 50 00:02:00,630 --> 00:01:58,000 of the columbus module he'll retrieve it 51 00:02:05,429 --> 00:02:00,640 from there and then move it down to his 52 00:02:09,190 --> 00:02:05,439 worksite interface on the pma which is 53 00:02:12,070 --> 00:02:09,200 more zenith and a little bit toward port 54 00:02:15,190 --> 00:02:12,080 from there each of them have access to 55 00:02:16,470 --> 00:02:15,200 be able to uh reach their cables 56 00:02:19,110 --> 00:02:16,480 jeff's cables have also been 57 00:02:21,350 --> 00:02:19,120 pre-positioned on a prior eva uh terry 58 00:02:23,190 --> 00:02:21,360 bertz left two bundles of cables there 59 00:02:24,869 --> 00:02:23,200 for him to access 60 00:02:26,710 --> 00:02:24,879 once they get into their foot restraints 61 00:02:28,470 --> 00:02:26,720 they can attach their adjustable 62 00:02:31,589 --> 00:02:28,480 equipment tethers 63 00:02:34,150 --> 00:02:31,599 loosely to the ida 64 00:02:35,830 --> 00:02:34,160 kate has one adjustable tether and in 65 00:02:38,070 --> 00:02:35,840 order to be able to reach between the 66 00:02:39,830 --> 00:02:38,080 handrail and the ida 2 67 00:02:41,589 --> 00:02:39,840 jeff actually has two 68 00:02:43,030 --> 00:02:41,599 tethers in series 69 00:02:45,110 --> 00:02:43,040 when they're in position they'll give 70 00:02:48,790 --> 00:02:45,120 the go to the robotics operator on the 71 00:02:50,390 --> 00:02:48,800 ground to release the ida 2 and back the 72 00:02:52,790 --> 00:02:50,400 dexter arm away 73 00:02:54,550 --> 00:02:52,800 at this point the crew has 74 00:02:56,869 --> 00:02:54,560 complete control of the ida they'll 75 00:02:59,830 --> 00:02:56,879 cinch the tethers down into place and 76 00:03:00,869 --> 00:02:59,840 then they'll begin mating the cables 77 00:03:03,430 --> 00:03:00,879 this is 78 00:03:05,350 --> 00:03:03,440 kate's cable configuration on the nader 79 00:03:07,990 --> 00:03:05,360 side here we see her at the neutral 80 00:03:09,350 --> 00:03:08,000 buoyancy laboratory practicing those 81 00:03:11,509 --> 00:03:09,360 cable mates 82 00:03:13,910 --> 00:03:11,519 and while she's mating her cables on the 83 00:03:16,790 --> 00:03:13,920 nader side jeff is mating his on the 84 00:03:19,030 --> 00:03:16,800 zenith side he has three cables to 85 00:03:20,309 --> 00:03:19,040 initially mate these cables are 86 00:03:23,589 --> 00:03:20,319 providing 87 00:03:26,470 --> 00:03:23,599 heater power to the docking adapter as 88 00:03:28,149 --> 00:03:26,480 well as the hook drive power and the 89 00:03:30,949 --> 00:03:28,159 sensor power 90 00:03:34,149 --> 00:03:30,959 these switches will be commanded by the 91 00:03:36,789 --> 00:03:34,159 internal crew member iv crew member talk 92 00:03:40,390 --> 00:03:36,799 will work at the ida control panel which 93 00:03:43,190 --> 00:03:40,400 is in the node 2 pressurized volume 94 00:03:45,190 --> 00:03:43,200 as he operates the switches it commands 95 00:03:48,229 --> 00:03:45,200 the hooks that are on the docking 96 00:03:50,710 --> 00:03:48,239 adapter to extend out rotate around and 97 00:03:53,030 --> 00:03:50,720 engage the passive hooks that are on the 98 00:03:54,949 --> 00:03:53,040 pressurized mated adapter 99 00:03:56,710 --> 00:03:54,959 there's two sets of hooks and while they 100 00:03:58,710 --> 00:03:56,720 drive the first set of hooks the crew 101 00:04:00,470 --> 00:03:58,720 needs to remain still but during the 102 00:04:03,110 --> 00:04:00,480 second drive it's stable enough that 103 00:04:05,589 --> 00:04:03,120 they can begin work uh installing a 104 00:04:08,710 --> 00:04:05,599 cover on the hemi reflector that's on 105 00:04:10,470 --> 00:04:08,720 the nadir part of the pma2 106 00:04:13,270 --> 00:04:10,480 then they're into their final cable 107 00:04:15,990 --> 00:04:13,280 mates these spinal cable configurations 108 00:04:19,110 --> 00:04:16,000 remove the power from the hooks that 109 00:04:22,550 --> 00:04:19,120 we're driving to engage the pma and 110 00:04:24,310 --> 00:04:22,560 provide visiting vehicle hook power 111 00:04:26,629 --> 00:04:24,320 here you see jeff working in the neutral 112 00:04:29,189 --> 00:04:26,639 buoyancy laboratory he's removing a 113 00:04:31,909 --> 00:04:29,199 couple of jumpers that are required to 114 00:04:34,150 --> 00:04:31,919 do his final cable mating once the 115 00:04:35,749 --> 00:04:34,160 cables are mated they have some 116 00:04:37,670 --> 00:04:35,759 outfitting to do 117 00:04:40,390 --> 00:04:37,680 first they'll be covering up the h 118 00:04:43,830 --> 00:04:40,400 fixture that the dexter robot arm was 119 00:04:46,629 --> 00:04:43,840 holding on to then there is a another 120 00:04:49,749 --> 00:04:46,639 hemi reflector that is on the 121 00:04:51,749 --> 00:04:49,759 pma they'll install a cover over the top 122 00:04:55,189 --> 00:04:51,759 of it and then move the tether that was 123 00:04:57,909 --> 00:04:55,199 holding that cover in place up to 124 00:05:00,870 --> 00:04:57,919 tether to the large protective cover 125 00:05:02,550 --> 00:05:00,880 that's covering the ida ii that was in 126 00:05:03,590 --> 00:05:02,560 place for launch 127 00:05:06,310 --> 00:05:03,600 in 128 00:05:08,150 --> 00:05:06,320 the spacex dragon there are several 129 00:05:11,189 --> 00:05:08,160 straps that they need to work together 130 00:05:12,870 --> 00:05:11,199 to remove it's very similar to the pma 131 00:05:15,430 --> 00:05:12,880 covers that we've been installing and 132 00:05:17,830 --> 00:05:15,440 removing in the past here you see kate 133 00:05:20,070 --> 00:05:17,840 working in the nbl to remove 134 00:05:21,110 --> 00:05:20,080 the straps from the handrails holding it 135 00:05:23,189 --> 00:05:21,120 in place 136 00:05:26,950 --> 00:05:23,199 the two of them need to work together to 137 00:05:29,430 --> 00:05:26,960 stuff that cover into the oru bag 138 00:05:33,350 --> 00:05:29,440 at that point they can install the two 139 00:05:35,110 --> 00:05:33,360 hemi reflectors onto the docking adapter 140 00:05:37,830 --> 00:05:35,120 and then the final thing that they need 141 00:05:40,950 --> 00:05:37,840 to do is made up the visiting vehicle 142 00:05:42,870 --> 00:05:40,960 power it's one final cable configuration 143 00:05:43,830 --> 00:05:42,880 that needs to be made 144 00:05:46,230 --> 00:05:43,840 jeff 145 00:05:48,629 --> 00:05:46,240 will complete that mating and at this 146 00:05:52,150 --> 00:05:48,639 point that docking adapter is ready to 147 00:05:53,990 --> 00:05:52,160 receive our new crew vehicles 148 00:05:55,990 --> 00:05:54,000 the crew can pack up and clean up this 149 00:05:59,430 --> 00:05:56,000 work site kate will pick up her foot 150 00:06:00,870 --> 00:05:59,440 restraint and return it to the esp2 from 151 00:06:04,230 --> 00:06:00,880 once it came 152 00:06:06,790 --> 00:06:04,240 jeff has to pack up the oru bag and also 153 00:06:09,110 --> 00:06:06,800 return his foot restraint 154 00:06:11,350 --> 00:06:09,120 his foot restraint goes back 155 00:06:13,749 --> 00:06:11,360 from where it's located where he's been 156 00:06:16,710 --> 00:06:13,759 using it on the pma he'll take it back 157 00:06:19,510 --> 00:06:16,720 up to the top of the columbus module 158 00:06:22,070 --> 00:06:19,520 it'll be staged there in place for the 159 00:06:25,430 --> 00:06:22,080 ida 3 installation that will be 160 00:06:27,350 --> 00:06:25,440 happening in late 2017. 161 00:06:30,390 --> 00:06:27,360 they return the oru bag back to the 162 00:06:33,270 --> 00:06:30,400 airlock and then go out kate will go out 163 00:06:36,950 --> 00:06:33,280 to the lab nader to a bag that's already 164 00:06:38,870 --> 00:06:36,960 there and route the cable for ida 3 we 165 00:06:40,870 --> 00:06:38,880 call it the white green cable because we 166 00:06:42,950 --> 00:06:40,880 put some tape marks on it in white and 167 00:06:45,590 --> 00:06:42,960 green to indicate which one it is she 168 00:06:47,749 --> 00:06:45,600 routes it forward to the node 2 where 169 00:06:49,350 --> 00:06:47,759 it's in position for the ida 3 170 00:06:51,749 --> 00:06:49,360 installation 171 00:06:55,990 --> 00:06:51,759 jeff has some work to do back 172 00:06:58,870 --> 00:06:56,000 in the area where the z1 the node 1 the 173 00:07:00,629 --> 00:06:58,880 node 3 and the lab all come together we 174 00:07:01,990 --> 00:07:00,639 refer to this area as the rats nest 175 00:07:03,270 --> 00:07:02,000 because of all of the cables and 176 00:07:06,629 --> 00:07:03,280 electrical 177 00:07:09,110 --> 00:07:06,639 route through that area 178 00:07:12,950 --> 00:07:09,120 he'll pick up the cable bundle that was 179 00:07:14,870 --> 00:07:12,960 left in position at the end of eva 35 180 00:07:17,749 --> 00:07:14,880 you'll make a couple of connections down 181 00:07:19,029 --> 00:07:17,759 on the node 2 and then route that cable 182 00:07:20,950 --> 00:07:19,039 across 183 00:07:23,670 --> 00:07:20,960 the z1 tray 184 00:07:25,589 --> 00:07:23,680 over to the starboard side of that tray 185 00:07:27,749 --> 00:07:25,599 and then leave it in position there 186 00:07:30,469 --> 00:07:27,759 where it will be ready for its final 187 00:07:33,350 --> 00:07:30,479 routing on a future eva the last 188 00:07:36,309 --> 00:07:33,360 scheduled task for this spacewalk will 189 00:07:38,070 --> 00:07:36,319 be to remove a couple of caps from some 190 00:07:39,909 --> 00:07:38,080 connectors that are located just 191 00:07:41,830 --> 00:07:39,919 underneath the z1 192 00:07:43,430 --> 00:07:41,840 on the outside of the 193 00:07:45,029 --> 00:07:43,440 node one 194 00:07:47,270 --> 00:07:45,039 at that point the crew will return to 195 00:07:49,510 --> 00:07:47,280 the airlock and ingress 196 00:07:51,110 --> 00:07:49,520 if we've been particularly 197 00:07:53,350 --> 00:07:51,120 lucky and efficient throughout the day 198 00:07:54,790 --> 00:07:53,360 and the hardware cooperates rather than 199 00:07:57,350 --> 00:07:54,800 ingressing the airlock we've got a 200 00:07:59,990 --> 00:07:57,360 couple of get ahead tasks that we can do 201 00:08:02,629 --> 00:08:00,000 one of them is to configure the port 202 00:08:04,950 --> 00:08:02,639 cedar cart we'll tie down the brake 203 00:08:07,670 --> 00:08:04,960 handles to keep them out of the way for 204 00:08:09,749 --> 00:08:07,680 long-term operations on station and then 205 00:08:12,710 --> 00:08:09,759 we also want to get some photos of the 206 00:08:14,469 --> 00:08:12,720 alpha magnetic spectrometer from the 207 00:08:16,790 --> 00:08:14,479 windows and from all the cameras on 208 00:08:19,430 --> 00:08:16,800 space station we cannot see the outboard 209 00:08:21,909 --> 00:08:19,440 side of the ams we'd like to get some 210 00:08:22,950 --> 00:08:21,919 photos of that area see how it's doing 211 00:08:24,710 --> 00:08:22,960 so 212 00:08:25,990 --> 00:08:24,720 they can get those photos from the top 213 00:08:27,909 --> 00:08:26,000 of the